https://www.automationgroup.com/wp-content/uploads/2023/11/shutterstock_2031509396-1280x640.jpg

Challenges arise when hardware and software become outdated. This was the case for a leading food manufacturer who needed modernized controls for their warehouse conveyor system. The existing Allen-Bradley PLC-5 hardware was obsolete and lacked modern communication protocol. The conveyor system also lacked HMIs to monitor processes, identify problems, and visualize data. Because of this, the customer sought the help of Automation Group, an E Tech Group company, to upgrade their Allen-Bradley PLC-5 to the latest Rockwell Automation ControlLogix L81E processor, integrate AVEVA InTouch HMI stations, and connect devices over an EtherNet/IP communication network.

https://www.automationgroup.com/wp-content/uploads/2023/01/shutterstock_1563111487-1280x640.jpg

Complex upgrades require advanced expertise. Experienced system integrators will use a holistic approach to fully scope automation system upgrades and consider how the project’s complexities will impact the customer’s budget, uptime, timeline, or performance requirements. An example of this was a PLC-5 and SCADA application upgrade for a leading rice milling company. The company had an obsolete PLC-5 controlling their rice finishing line, in addition to an obsolete SCADA application controlling their entire facility. The legacy SCADA system was costly to keep operational, and the existing network caused communications issues between the customer’s production areas. The customer needed a new PLC program to be installed within a 48-hour timeframe to minimize production impacts, and the existing SCADA system needed to remain operational during the migration to Inductive Automation’s Ignition platform. Automation Group was engaged as the customer’s choice system integrator given their advanced expertise in system migration and the successful execution of projects at the customer’s other facilities.

https://www.automationgroup.com/wp-content/uploads/2022/09/shutterstock_1956543382-e1663954156946-1280x640.jpg

When is the best time to upgrade a decades-trusted PLC system? This was the challenge for a global supplier of spice ingredients. Their Allen Bradley PLC-5 system was commissioned over 25 years ago and, while it performed well for many years, the outdated platform began experiencing constraints. The obsolete equipment was limiting network connections. This urged the global spice supplier to seek a system integrator that could provide timely PLC migration support using the latest technology available. Automation Group was recruited to modernize their obsolete PLC system to a more IIOT friendly platform.

https://www.automationgroup.com/wp-content/uploads/2022/09/IMG_2979-1280x640.jpg

From decreased productivity to system downtime, legacy equipment can pose many challenges to operational efficiency. This was the case for a leading consumer packaged goods company who was relying on PLC-5 hardware to control most of their facility. The plant recently experienced a major disruption during peak production because of a network switch failure, and it was later discovered that the disruption could have been minimized if the facility had been separated into multiple virtual local area networks (VLANs). To support the creation of VLANs, the customer’s existing PLC-5 control system would need to be upgraded to the ControlLogix system which could handle multiple independent Ethernet connections. Automation Group was called to support the project given their previous assistance with consolidating the company’s DH+ and ControlNet network communications in support of their industrial automation applications.

Loading...