Challenge

Outdated controls can pose many operational challenges. Companies that operate with outdated controls often experience frequent downtime, expensive or obsolete hardware replacement parts, or few personnel with knowledge to perform maintenance on legacy systems. These challenges were faced by a long-running California winery who needed to modernize the controls for their red fermentation process. The winery needed to address how a system upgrade would impact their operations and engaged Automation Group to create a PLC and SCADA upgrade solution.

Solution

The first step was to create a well-documented project plan. Automation Group analyzed the existing system design and detailed existing hardware components, software configurations, and network connections. This step was crucial to have an accurate picture of their current control environment to mitigate production impacts during the implementation phase.

The project team upgraded hardware and reconfigured the customer’s existing Ignition SCADA software for seamless post-upgrade operations. The original red fermentation process was conformed with three areas:  pump over area, continuous press area, and decanters area. Previously, each area had their own PLC but the upgraded system connected an Allen-Bradley ControlLogix PLC as the main controller and remote IO was added to control the three areas into one. The system was programmed with ladder logic to the customer’s existing Ignition SCADA software, and seven new PanelView Plus HMIs were also programmed with FactoryTalk View ME as the customer’s choice visualization software.  

Photo of general view of modern wine factory with fermentation tanks
Results

The project team leveraged their PLC programming, Ignition SCADA software, and controls engineering expertise to resolve software compatibility issues, bugs in the programming code, and electrical connection challenges. The team supported the project to resolve these challenges and performed extensive testing. With the PLC and SCADA upgrade complete, the customer was able to improve the uptime of its red fermentation process and eliminated the key challenges of legacy system maintenance.